Why DC Residents Shouldn’t Foot the Bill for Gas at RFK Stadium

On November 17, DC’s Green Building Advisory Council (GBAC) voted to recommend that the Director of the District Department of Energy and Environment deny the Washington Commanders’ request to burn fossil gas onsite at the future RFK stadium.
The decision has significant implications for DC and its residents—for energy affordability, public health, and investments in DC buildings and neighborhoods.
A once-in-a-lifetime opportunity for DC
The planned 65,000-seat RFK stadium, expected to open in 2030, represents approximately $1 billion in public investment by the city and more than $2.7 billion in private investment (the largest in our city’s history).
A new, all-electric stadium is a once-in-a-lifetime opportunity for DC to build in a way that protects our health and future, positioning our nation’s capital as a national leader in green building investment.
If done right, District residents could even benefit from a newly created energy market. A neighborhood-scale flexible energy system could lower energy costs for all DC residents and affirm a 100 percent clean energy RFK Campus Master Plan. Electrify DC outlines that vision in its recommendations to the District.
Instead, the Commanders propose to use fossil fuel gas to heat and cook at the stadium. Beyond the health impacts of cooking with gas, that proposal runs counter to the DC Green Building Act and the Greener Government Buildings Amendment Act, which established net-zero energy and fossil fuel-free construction requirements for qualifying government-owned or financed buildings.
District residents cannot afford to subsidize a multibillion-dollar stadium’s unnecessary gas infrastructure
Average residential electricity rates in the District surged by nearly 70% between 2017 and 2025, and 40% of low-income households across the DC metropolitan area spend more than 10% of their income on energy.
Under traditional utility regulation, Washington Gas can charge customers’ utility bills for approved gas infrastructure investments PLUS earn an authorized return on equity of 9.65%. If the Commanders’ design team does not design an all-electric stadium, Washington Gas customers will be paying for the stadium’s gas pipeline for decades.
The Commanders have the resources to invest in existing technologies, including battery storage, high-performance electric cooking equipment, electric heat pumps, and thermal energy storage, thereby avoiding the need for duplicative energy infrastructure, such as a new gas pipeline.
DC is a clean energy leader—gas at RFK is a step backward
In January 2025, Electrify DC’s Co-Founder and Executive Director Vanessa Bertelli was appointed to serve on the Green Building Advisory Council (GBAC), a body of government officials and private sector building decarbonization experts that advises the Director of the District Department of Energy and Environment (DOEE) on the implementation of the Green Building Act of 2006.
The District has already demonstrated what is possible through its investment in Net Zero Energy public buildings, including John Lewis Elementary School, where energy-efficient design and geothermal heating and cooling reduce operating costs. DC saves $300,000 on energy every year at the school.
The District is applying these same building standards to community facilities. “It’s a model of what responsible, competitive urban development looks like,” wrote Vanessa Bertelli, Electrify DC’s Co-Founder and Executive Director and a member of the District’s Green Building Advisory Council, about the modernization of the Upshur Recreation Center in Petworth.
The RFK redevelopment should build on, rather than reverse, this progress.
Through its work on the GBAC, Electrify DC has helped improve numerous publicly owned or financed buildings, from schools and recreation centers to emergency medical services stations and hospitals. The GBAC has achieved successes through collaborative discussions with design teams and with the operational support of DOEE’s green building team. Design teams have historically collaborated with the GBAC to improve the health and safety of DC residents, bring the District closer to meeting its net-zero goals, and reduce the long-term operational costs of our public buildings.
In contrast, the Commanders’ design team declined to continue working with the GBAC to explore alternative energy solutions.
Residents can still shape the future of RFK
The GBAC’s vote is a recommendation, not a final decision. District residents still have an opportunity to influence whether the Commanders receive exemptions from DC’s green building requirements.
With approximately $1 billion in public investment, District residents have a say in how the stadium is built and how it will affect their health and energy bills for generations to come.
You can still share your thoughts about an all-electric RFK stadium.
There's still time to share your thoughts with the Commanders, Mayor Bowser, and your DC Councilmembers around upholding the District’s green building requirements, exploring electric alternatives, and protecting residents from unnecessary costs of gas infrastructure.